A remotely operated cast iron penstock was inoperable at Mosseley Service Reservoir, Yorkshire.

PMP were commissioned to remove the old penstock, install a new stainless steel penstock and to design and install a new remotely controlled operating gear.

By prefabricating all stainless steel components and testing the system at our Haslingden based Engineering Workshop, PMP were able to remove the old penstock and install the new penstock and control system in just two days.